Plan Review Requirements
New construction or renovations to an existing building will require a plan review prior to beginning construction.
Alabama law 34-2-32 requires plans and specifications to be prepared by a registered architect for all buildings that are 2,500 square feet or more.
The Plan Review Application and documents should be submitted to [email protected] at the Bureau of Environmental Services, Manufactured Food Processing Program for review.
Hard copies of the Plan Review Application, drawings/plans, and documents can be mailed to:
Bureau of Environmental Services
ATTN: Manufactured Food Processing Branch
201 Monroe Street, Suite 1250
Montgomery, AL 36104
Facility Design Guidance
Good Manufacturing Practices (GMPs) provide insight on how to design a facility centered on food safety. A well planned flow of food through the facility helps maintain its safety. Thinking of your processes and how foods will be handled allows you to design a building that works for you.
The guidance below mirrors GMPs and details the information necessary to complete a plan review. For more details about plan review requirements, see Chapter 420-3-20.08 in the Administrative Code Chapter 420-3-20 Food Processing Establishment Sanitation.
Grounds
- Site plans that show the location of the building on the property, dumpsters/trash, receiving, and shipping loading docks, water source, sewage disposal
- Sized adequate for the operation and volume of production anticipated
- Process Flow considered in the layout of the interior of the facility and equipment
- Floor plans drawn to scale, to include:
- Receiving
- Storage (raw materials, finished products, and containers)
- Production Lines and Equipment
- Handwashing Sinks
- Warewashing Area (if applicable)
- Quality Assurance Lab (if applicable)
- Employee Breakroom
- Restrooms
- Shipping
- Finish schedule of materials used for floors, walls, cove base, and ceilings
- Construction details showing elevation drawings, onsite built equipment, and cabinetry
- Door schedule identifying door closures, hardware, and pest protection
- Equipment schedule labeling each piece of equipment
- Mechanical plans to include air conditioning & heating units, vent locations, fan installation locations, and restroom recirculating fans
- Lighting plans showing locations of light fixtures, indicate light intensity, and shielding
- Plumbing plans indicating the location of wastewater lines, freshwater lines, grease trap (if applicable), water heater, fixtures, drain design (direct or indirect), floor sinks, and floor drains
- Equipment specification sheets for each item installed showing the dimensions, make, and model number.
- Customized equipment should be included in the plan’s construction details.
- Food contact surfaces must be corrosive-resistant, non-toxic, designed for easy cleaning, and able to withstand its intended use.
- Specification sheets for thermometers, pH meters, and water activity meters should be included.
- Food Safety Plan
- Identify Hazards
- Process Controls or Critical Control Points (CCP’s)
- Standard Operating Procedures (SOP’s) addressing these following items:
- Personnel
- Employee Sick Policy
- Hygienic Practices
- Education and Training
- Flow of Food
- Source
- Receiving
- Storage
- Preparation
- Cooking
- Cooling
- Packaging
- Sampling
- Storage
- Transport & Distribution
- Allergen Cross-Contact
- Cleaning and Sanitizing
- Pest Control
- Sanitary Processes and Controls
- Warehousing and Distribution
- Supply Chain
- Recall Process
- Reportable Food Registry (RFR)
- Labels and Packaging for Each Item Manufactured
- Distribution Plan
- Special Processes Documentation (if applicable)
Next: Permitting